Hostel Project for Students of the

College of Medicine, University of Ibadan (CoMUI)

administered by the 

Ibadan College of Medicine Alumni Association (ICOMAA)

 

Construction Activity Reporting Schedule: 11th Report

Date: 22nd April 2024

Site Construction Activities

 

BLOCK C (PHILIP OZUAH BLOCK)

 

Update: The construction activities on this block include the raising of second-floor slab beam formworks and the placing of reinforcements. Placement of the reinforcements into the beam formworks, second-floor slab formworks, and striking off of the formwork below the first-floor slab are ongoing. Block wall partition work commenced and is still ongoing.

 

As of 18th of April 2024, the raising and casting of the columns to support the second-floor slab had commenced.

 

Progress Pictures of Block C

   

                           

   

 

 

 

 

 

 

BLOCK D (TY DANJUMA BLOCK)

 

Update: The laterite earth filling is still ongoing. Concrete blinding of the ground beam and the placement of the reinforcement has commenced.

 

As of 18th of April 2024, laterite earth filling had reached 60% completion, weak concrete blinding of the ground beam had reached 40%, while the placement of the reinforcement had reached 30% completion.



Pictures of Block D

     

         

 

 

BLOCK F (ALUMNI BLOCK)

 

Update: The placement of reinforcements for the oversight concrete slab is still ongoing. The laterite earth filling and compaction are ongoing.

 

As of the 18th of April 2024, the laterite earth filling and compaction were ongoing. The placement of reinforcements for the oversite concrete slab had reached 80% completion.

 

 

Pictures of Block E

   

     

 

Signed,

Arc. Dapo Ojo

Project Client Representative

 

Adapted for publication by 

�Seun Abimbola

Media Officer

 