Hostel
Project for Students of the College of Medicine, University of Ibadan (CoMUI) Administered
by the
Ibadan College of Medicine Alumni Association (ICOMAA)
Construction Activity Reporting Schedule: 21st Report
Date: 23rd June 2024.
Site Construction Activities
Block C (Philip Ozuah Block)
Update: The formwork for the third-floor slab, the floor slab soffit plaster and the aluminum window installation are still ongoing.
Timeline: This is as of the 17th of June - 21st of June 2024.
Challenges: There has been no significant challenge in the construction work of block C.
Pictures of Work done on site
Block D (TY Danjuma Block)
Update: The first-floor slab formwork, steel reinforcement and electrical/mechanical services sleeves placement are ongoing.
Timeline: This is as of the 17th of June - 21st of June, 2024
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block E
Update: The formwork for the ground beam and steel reinforcement placement are ongoing.
TimeLine: This is as of the 17th of June - 21st of June, 2024
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block F (ICOMAA Block)
Update: The reinforced concrete columns are being raised on the first-floor slab.
Timeline: As of the 10th of June - 14th of June,
Challenges: There has been no significant challenge on the construction works of this block.
Pictures of Work done on site
Signed,
Arc. Dapo Ojo
Project Client Representative
Adapted for publication by
‘Seun Abimbola
Media Officer