Construction Activity Reporting Schedule: 24th Report
Date: 13th July, 2024.
Site Construction Activities
Block C (Philip Ozuah Block)
Update: The blockworks on the first floor for both external walls and partition walls are ongoing.
TimeLine: This is as of the 8th of July - 12th of July, 2024.
Challenges: There has been no significant challenge in the construction works of
this block.
Pictures of Work done on site
Block D (TY Danjuma Block)
Update: The raising of the steel reinforcements for the reinforced concrete columns to support the second-floor slab.
TimeLine: This is as of the 8th of July - 12th of July, 2024.
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block E (Block)
Update: The concrete casting of the ground beam of the foundation is ongoing.
TimeLine: As of the 8th of July - 12th of July, the concrete casting of the ground beam of the foundation has reached 50% completion.
Challenges: No statement on this as of the time of this report.
Pictures of Work done on site
Block F (ICOMAA Block)
Update: The formwork of the floor beams and the slab of the first floor is ongoing.
Timeline: This is as of the 8th of July - 12th of July, 2024.
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Signed,
Arc. Dapo Ojo
Project Client Representative
Adapted for publication by
‘Seun Abimbola
Media Officer