Hostel Project for Students of the College of Medicine, University of Ibadan (CoMUI)
Spearheaded by the
Ibadan College of Medicine Alumni Association (ICOMAA)
Construction Activity Reporting Schedule
Date: 29th January, 2024.
Site Construction Activities
Block C (Philip Ozuah Block)
Update: The boarding of the formworks for the beams of the first-floor slab is continuing on site, as the making of formworks to receive the steel reinforcements for the beams has reached 40% completion. The fabrication of the steel handrails is also going on site. The contractor also took delivery of more building materials such as tiles and hardwood timber planks.
The Situation with Timeline:
Pictures of work done on site
Block D (TY Danjuma Block)
Update:
The contractor is still engaged in sand filling and compaction of the foundation base.
The Situation with Timeline:
Pictures of Work done on site
Block F (Alumni Block)
Update: The excavation work for the foundation base has been 95% completed, as the contractor commenced taking levels and blinding of the foundation base.
The situation with Timeline:
As of the 22nd- 27th of January, the commenced excavation work of the foundation base is still ongoing, it has reached 95% completion
Pictures of work done on site
Arc. Dapo Ojo
Project Client Representative
Adapted for publication by
Seun Abimbola