Hostel Project for Students of the College of Medicine, University of Ibadan (CoMUI) Administered by the 

Ibadan College of Medicine Alumni Association (ICOMAA)

Construction Activity Reporting Schedule: 20th Report

Date: 14th June, 2024.

Site Construction Activities

 

Block C (Philip Ozuah Block)

Update: The beam and slab formwork for the third-floor slab and the floor slab plastering soffit are ongoing. 

TimeLine: This is as of the 10th of June - 14th of June, 2024.

Challenges: There has been no significant challenge in the construction works of this block.

 

Pictures of Work done on site

   

   

   

   

 

Block D (TY Danjuma Block)

Update: The reinforcement placement on the formwork of the first-floor slab is ongoing.

TimeLine: This is as of the 10th of June - 14th of June, 2024.

Challenges: There has been no significant challenge in the construction works of this block.

 

 

 

 

 

 

 

 

 

 

 

Pictures of Work done on site

 

 

Block E

Update: The formwork for the ground beam is being placed on the foundation trenches after blinding has been done.

TimeLine: As of the 10th of June - 14th of June, 

 

Challenges: 

 

Pictures of Work done on site

   

   

       

 

Block F (ICOMAA Block)

Update: The reinforced concrete columns are being raised on the first-floor slab

Timeline: This is as of the 10th of June - 14th of June, 2024.

Challenges: There has been no significant challenge in the construction works of this block.

 

 

 

 

 

 

 

 

 

 

 

 

Pictures of Work done on site

    

   

   

     

       

       

Signed,

Arc. Dapo Ojo

Project Client Representative

 

Adapted for publication by 

‘Seun Abimbola

Media Officer