Site Construction Activities
Block C (Philip Ozuah Block)
Update: The beam and slab formwork for the third-floor slab and the floor slab plastering soffit are ongoing.
TimeLine: This is as of the 10th of June - 14th of June, 2024.
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block D (TY Danjuma Block)
Update: The reinforcement placement on the formwork of the first-floor slab is ongoing.
TimeLine: This is as of the 10th of June - 14th of June, 2024.
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block E
Update: The formwork for the ground beam is being placed on the foundation trenches after blinding has been done.
TimeLine: As of the 10th of June - 14th of June,
Challenges:
Pictures of Work done on site
Block F (ICOMAA Block)
Update: The reinforced concrete columns are being raised on the first-floor slab.
Timeline: This is as of the 10th of June - 14th of June, 2024.
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site