Hostel Project for Students of the College of Medicine, University of Ibadan (CoMUI) Administered by the
Ibadan College of Medicine Alumni Association (ICOMAA)
Construction Activity Reporting Schedule: 25th Report
Date: 22nd July, 2024.
Site Construction Activities
Block C (Philip Ozuah Block)
Update: The fixing of steel handrails on the ground and first floor is ongoing.
Timeline: This is as of the 15th of July - 19th of July, 2024
Challenges: There has been no significant challenge in the construction work of
this block.
Pictures of Work done on site
Block D (TY Danjuma Block)
Update: The steel reinforcements for the concrete columns on the first-floor slab are being raised.
The situation with TimeLine: As of the 15th of July - 19th of July,
Challenges: There has been no significant challenge in the construction works of this block.
Pictures of Work done on site
Block E
Update: The striking-off of the formwork from the ground beam of the foundation is ongoing.
TimeLine: As of the 15th of July - 19th of July, the striking-off of the formwork from the ground beam of the foundation had commenced.
Pictures of Work done on site
Block F (ICOMAA Block)
Update: The soffit of the first-floor slab after the striking-off of the formwork is ongoing. The placement of the steel reinforcements, electrical and mechanical services sleeves on the second-floor slab formwork are also ongoing.
Timeline: This is as of the 15th of July - 19th of July, 2024.
Challenges: There has been no significant challenge in the construction work of this block.
Pictures of Work done on site
Signed,
Arc. Dapo Ojo
Project Client Representative
Adapted for publication by
‘Seun Abimbola
Media Officer