Hostel Project for Students of the College of Medicine, University of Ibadan (CoMUI) Administered by the 

Ibadan College of Medicine Alumni Association (ICOMAA)

 

Construction Activity Reporting Schedule: 29th Report

Date:   4th September 2024.

Site Construction Activities

 

Block C (Philip Ozuah Block)

Update: The completion of the casting of the third-floor slab and raising of the reinforced concrete columns

Timeline: As at 26th of August - 30th of August, the program of work is being followed.

Challenges: There are no significant challenges in the construction works of 

this block.

Pictures of work done on site

    



Block D (TY Danjuma Block)

Update: The steel reinforcement, and mechanical/electrical service sleeves placement for the casting of the second-floor slab are ongoing.

Timeline: As of 26th of August - 30th of August, the steel reinforcement, and mechanical/electrical service sleeves placement for the casting of the second-floor slab are nearing completion.

Challenges: There are no significant challenges in the construction works of this block.

 

 

 

 

 

 

 

 

 

 

 

 

Pictures of Work done on site

 

Block E (Block)

Update: The oversite concrete casting, steel reinforcement, and mechanical /electrical services placement are ongoing.

TimeLine: As at 26th of August - 30th of August, the oversite concrete casting, steel reinforcement, and mechanical/electrical services placement are nearing 50% completion.

Challenges: There are no significant challenges in the construction works of this block to report.

 

Pictures of work done onsite

    

 

Block F (Alumni Block)

Update: The striking-off of the formwork on the first-floor slab soffit, propping of the formwork and placement of the steel reinforcement for the third-floor slab.

Timeline: As at 26th of August - 30th of August, the program of work is being followed.

Challenges: There are no significant challenges in the construction works of this block.

 

Pictures of work done onsite

    

    

    

    

    

 

       

Signed,

Arc. Dapo Ojo

Project Client Representative

 

 

Adapted for publication by 

‘Seun Abimbola

Media Officer